Locker rooms
Construction time: 3 days
In addition to thermal insulation, a locker room built with Flexmade structural panels has easy installation of electrical and hydraulic components, reducing expense, construction time and environmental impacts.
It can be assembled and disassembled as many times as necessary, with 100% reuse of the material. Its construction uses little labor and equipment, does not use water, does not produce waste and also reduces energy consumption, in addition to being easy to transport the structure, since the panels are light.
Want to know more? Our experts help you from the design of the project to the selection and installation of coatings and complements.
With the Flexmade panel, your project will be built with much more speed, quality and economy.